Back to Season
Episode 3

Insiders Project · Season 1

Top of Kyiv's South Bridge

Air date unknown26 min

Marking as watched is unavailable until an air date is confirmed.

Overview

The shooting crew follows through the internal constructions of the South Bridge. Having passed the whole bridge inside, the team goes up vertical cables 300 meters long. A hand-made construction for ascent, strong arms and self-confidence - these are the only things the team relies on. Throwing a climbing hook with a rope, the shooting crew gets to the peak using a hand-made ladder.

Terrible
Timepass
Worth Watch
Must Watch

Reviews

Reviews open once this episode has aired and its air date is confirmed.