Back to Season
No episode image available
Episode 9

MegaStructures · Season 6

Super Sky Tram

Dec 27, 200960 min

Overview

For over 40 years the Big Red Box at Jackson Hole, Wyoming, carried skiers, hikers, paragliders and sightseers up to the 3,400-metre summit of Rendezvous Mountain. But nothing lasts forever, so when cable inspector Norm Duke found evidence of stress fractures inside the aging steel track cables, there was no choice but to tear down and replace Jackson's iconic aerial tram. At a cost of US$31 million, this two year construction project is a top-to-bottom, state-of-the-art replacement. It will operate in 120 kph winds and minus 30°C temperatures, all with the quiet precision of a giant Swiss watch. Construction crews battle a record-breaking snowfall, zero visibility, high winds and impassable mud-slick mountain roads to build its five towers and two terminals, and string more than ten miles of heavy steel cable as they risk their lives in a battle to finish before winter closes in.

Terrible
Timepass
Worth Watch
Must Watch

Reviews

Share your take

Sign in to rate what you’ve watched, write a review, and join the conversation.

Sign in to review