Back to Season
No episode image available
Episode 8

This Old House · Season 13

The Wayland House - 8

Oct 24, 1991

Overview

Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

Terrible
Timepass
Worth Watch
Must Watch

Reviews

Share your take

Sign in to rate what you’ve watched, write a review, and join the conversation.

Sign in to review